|
|
|
|
Guangdong GuangHe Painting Equipment Co., Ltd.
Miss li: 16698528912 < br / >
Address£ºOpposite to xianzigang bus stop, Shiman Town, Nanhai District, Foshan City, Guangdong Province
Site£ºwww.gh0757.com |
|
|
|
|
|
|
|
The clean room cleaning method |
Click£º6065 Unit£ºwww.gh0757.com Time£º 2015/6/8 [Back] |
|
Choose a good automatic line, dusting,
ovens, water transfer printing, painting, clean room on the choice of promise positive mechanical Novo MACHINERY has extensive experience in sales of automatic painting equipment, spray drying curing equipment, UV fuel injection equipment Dongguan City Connaught positive Machinery Co., Ltd. is a research, manufacturing and processing, and sales of large enterprises. Long-term "first-class quality, first-class management, first-class service" for the purpose of "sincerity" to win the trust of the customers approach to science and technology, an industry-based, multi-industry simultaneously, more than a decade of steady development so Nordson become Guangdong coating industry and the country's well-known brands.
A cleaning requirements
1. Clean cleanroom should use cleanroom wall cloth;
2. 90% of deionized water and 10% isopropanol configuration cleaners;
3. Use approved clean room dedicated detergent;
The workshop should be checked daily and preparedness among the trash and clearing away promptly.
5. Each floor must vacuum. Every time shift, work should be marked on the map is completed, for example where to begin where end.
6. Clean clean room on the ground should use special mop.
7. vacuuming should be used in the clean room dedicated vacuum cleaner with a high efficiency filter.
8. The need to check all the doors and dry
9. sucking grazing land later. Rub one week once the wall.
Also vacuuming and wiping down 10. The raised floor.
11. The first three months rub under the raised floor pillars and support pillars.
12. The work should always be remembered, always wipe from top is down,
wiping direction from the direction of the door farthest from the door.
II. Clean room cleaning procedures
1. Replace good special anti-static clothing, wear a hat, masks, bath after wind dust suction path, into the clean room.
2. Prepare the cleaning tools and supplies,
and placed in the specified location, start cleaning.
3. ground garbage pick up, according to the production line Priorities out one by one from the inside.
The time dumping trash removal, trash bins inside and check strict accordance with the regulations classification, after the production line administrator or security checks delivered to the designated garbage room classification place.
5. from top to bottom with a clean paper or clean cloth to clean the interior glass,
walls, shelves,
6. Use a clean dust from the inside out carefully push push ground-dust cleaning. Ground garbage, dirt, water stains and other timely clean lint-free cloth.
7. The use of production line workers on the production line during the meal break, working the audience, to clean the floor under the chair.
8. Regularly clean the ceiling, air vents, ceiling compartment cover, under the elevated floor, cleaning procedures and materials used to apply for the approval of Ministry of Works, and the clearance work on holidays and holiday schedule.
9. cleanroom floor waxing should be strictly carried out according to plan and the cleaning procedure must use anti-static wax.
10. Upon completion of cleaning work need to be designated to receive all the cleaning supplies clean, and the difference between ordinary tool storage, to avoid cross-contamination, neatly placed, can not be indiscriminate in a clean room.
|
¡¾¹Ø±Õ´°¿Ú¡¿ |
|
|
|
|
|