A coating line
1.1 coating all air supply, exhaust pipes should be checked daily for its tightness shall not water leakage.
1.2 chamber body top cotton filters need regular inspection, timely removal of dust or be replaced. Every March cleared once replaced once a year.
1.3 circulating water tank regularly add mist coagulant, filter,
sink, grill should always clean (per week). Mist coagulant run once every two months.
1.4 fan belt replaced once every six months (also visual production to availability).
1.5 polished clean interior filter bags need to clean up once every two weeks (also visual production to availability).
1.6 Painting fan motor lubrication used (butter) monthly oil cup revolution (in a
timely manner within fuel oil cup) every three months plus oil lubrication grease once, playing grease lubrication grease once every two months .
Second, the product release chain
2.1 product release chain guide rollers plus grease lubrication every six months plus one (available in batches).
2.2 product release chain grease lubrication plus car duckbill head once every six months plus.
2.3 product release chain spray lubrication chain lubrication spray once a week, time of not less than four hours. (Domestic replenish oil tank)
2.4 product release chain tensioner bolts each drive unit once a month
2.5 product release chain sprockets connecting bolts should observe their health every day.
Third, the floor chain
3.1 ground station drive sprocket chain drive lubricating once per month, plus the drive chain oil once every two months.
3.2 Ground Flap inspected once a week, such as the need for timely leveling plate deformation.
3.3 Ground chain car checked daily fixing pins, each car in the assembly back on the line to check whether a fixed pin position in the chain drive.